Why do my totals differ from another Time in Status app?
Two things usually differ: the calendar and how revisits are counted. CyclePulse sums revisits to the same status, and measures against your work calendar — in 24/7 mode all elapsed time counts, in Work hours mode only your configured working days, hours and holidays count. If another tool assumes 24/7 and you are in Work hours mode (or vice versa), the totals will not match. Check the mode in Work Calendar first.
Why did my totals change after I switched timezone?
Working-hour boundaries are evaluated in the calendar's IANA timezone. The same changelog clips differently in another zone, so a Work hours total can shift. 24/7 totals never change with timezone. Daylight-saving transitions are handled automatically — there are no fixed UTC offsets.
Why does a day show zero time in Work hours mode?
That day is either outside your working days, outside your working hours, or marked as a holiday. Holidays are non-working days regardless of your working days, and a segment that only partially overlaps a holiday is clipped to exclude it.
Who can edit shared calendars?
By default, Jira administrators only. A Jira admin can grant Share calendars and Edit shared calendars to Jira groups in Jira settings > Apps > CyclePulse settings. The two rights are separate: sharing does not include changing or deleting someone else's calendar. Everyone with app access can use a shared calendar. The check runs on the server — hiding the button is not the security boundary.
An admin edited a shared calendar during my export — is my report still valid?
Yes. When you select a shared calendar, CyclePulse freezes its version for that report and export run. Mid-run edits do not change in-flight results, and the export header records the calendar name, ID and version that was used.
What happens if I do not have access to a shared calendar?
You fall back to your personal calendar, which defaults to 24/7 in your browser timezone.