Report Settings: the Work Calendar

Open Work Calendar in the top bar. It decides which calendar every duration is measured against, and it applies to the table, the summary cards and every export.

The picker shows each calendar's name, timezone and working hours. A read-only badge marks entries you cannot edit.

Editing your personal calendar

Configure mode (24/7 vs Work hours), timezone, working days, start/end hours, per-day overrides (overnight shifts supported), and holidays. Holidays are treated as non-working days regardless of your working days.

Shared calendars

Shared calendars are listed at the top of the Work Calendar dialog, each with the actions you are allowed to use:

By default only Jira administrators hold these permissions. Admins can grant them to Jira groups in 08 – Admin Settings: Permissions and Jira Fields.

A day cannot be saved with the same start and end time: that would count zero working hours, so CyclePulse asks you to fix it.

Once you pick a shared calendar, CyclePulse freezes its version for that report and export run. If an admin edits the calendar while your export is streaming, your numbers stay consistent with the version you started on — the export header records the calendar name, ID and version it used.

Show and hide columns

  1. Click Columns above the table
  2. Toggle any field: Type, Status, Assignee, Priority, Created, Lead Time, Cycle Time, Transitions, Flow Efficiency (once Cycle Time statuses are chosen), each status group and each status. Key and Summary are always shown
  3. Created is hidden by default to save width — re-enable it anytime